Floor Installation - Rubbermaid 5L10 Instrucciones De Uso Y De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.0 Floor Installation

a.
Using a utility knife, cut the long side of each wall slot
tab and then use a rubber mallet and screwdriver to
knock it out 8 places on Front Floor (A).
c.
Drill pilot hole through top surface of floor, 2 places on Front Floor (A).
CAUTION: Drill through top surface of floor only!
4
1.
2.
b.
Using a rubber mallet and screwdriver, knock out the
tabs for the door hinge, 2 places on Front Floor (A).
A
A
A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

7t53

Tabla de contenido