Visual Inspection - SMA ESHV-P-NR Instrucciones De Instalación

Kit de toma a tierra
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
Installation
Position of the adhesive mounting base
20 mm
Cable ties
6. Clean the surface to which the grounding set will be affixed with a degreasing, non-corrosive
cleaning agent. Take care to ensure that no moisture reaches the inverter's electronics.
7. Attach the two adhesive mounting bases about 2 cm apart from each other and press firmly for
5 seconds.
8. Feed the cable ties through the slots in the mounting base.
9. Fasten the grounding set with the aid of cable ties, then shorten the cable ties.
10. Feed the connection cables of the grounding set to the varistor terminal block.
11. Use the extractor tool to fasten the connection cables in the round varistor terminals with the
corresponding colored labeling (red cable to the terminal marked red, etc.).
12. Push the cable end sleeves all the way into the terminals.
13. Check the connection for reverse polarity protection:

Visual Inspection:

– Is the label properly positioned?
– Does it correspond to the right inverter type?
– Do the connection cable colors correspond to the terminal colors?
18
ESHV-IXX103013
SMA Solar Technology AG
Installation Guide

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Eshv-n-nr

Tabla de contenido