Kohler K-1647 Guia De Instalacion página 7

Ocultar thumbs Ver también para K-1647:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Steam Housing
Steam
Head
2. Install the Steam Head(s)
NOTICE: Do not obstruct the steam head with shut-off valves, plugs, or caps.
Subtract 1-1/4" (3.2 cm) from the marked length to determine the appropriate nipple size.
Choose a nipple length within 1/8" of the appropriate nipple size.
Apply thread sealant to the threads on one side of the nipple and thread that side into the steam
head housing until hand-tight.
Apply thread sealant to the threads on the other end of the nipple.
Position the gasket around the steam head housing so that it will be between the finished wall and
the steam head housing flange.
Use a 1" socket to thread the steam head housing assembly into the elbow in the wall.
Make sure the gasket is compressed and a good seal has been achieved around the edges of the
steam head housing.
Use an appropriate sealant to achieve a watertight seal if needed.
Press the steam head assembly into the steam head housing with the aromatherapy well positioned
on the top of the steam head.
Kohler Co.
1/2" NPT
Elbow
Apply thread sealant.
Wall
Nipple
Steam
Housing
7
Apply
thread sealant.
Aromatherapy
Well
Steam
Head
Lip
1045320-2-G

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1663K-1698

Tabla de contenido