1-1/4"
(3.2 cm) D.
60" (152.4 cm)
to Floor
Apply silicone sealant.
3. Install the Steam Control
WARNING: Risk of personal injury. Do not install the Steam Control User Interface outside the
steam enclosure. The User Interface must be installed within the enclosure to allow the sensors to
regulate the temperature and control the flow of steam.
Make sure that the power is turned off at the main breaker panel before proceeding.
Locate the control pad on the wall 60" (152.4 cm) from the floor.
At the selected location, drill a hole 1-1/4" (3.2 cm) in diameter.
NOTICE: Do not pinch, nail, wedge, or use undue force when handling the control connector and the
control pad wire. Any damage may result in control kit failure. If the control pad is not installed
immediately, protect the control connector with tape or other shielding material.
NOTICE: When installing the control kit, allow room in the control cable for a drip loop. The drip loop
will discourage moisture from following the control cable to the steam generator.
Pull the control connector from the steam generator through the drilled hole.
Carefully plug the control connector to the control pad wire using the double-end female connector
(provided).
Restore the power at the main breaker panel.
Turn on both water and power to the generator.
Test the control pad to ensure it is functioning properly. Refer to the "Using the Control Pad"
section.
Apply a continuous bead of silicone sealant around the back edge of the control pad.
Press the control pad firmly onto the wall.
Apply a bead of silicone sealant around the outside edge of the control pad. Use tape to secure the
control to the wall while the sealant cures.
Allow the silicone sealant to cure for 24 hours before use.
1045320-2-G
Control Connector
Control Pad
Back View
8
Apply silicone sealant.
Kohler Co.