Qwik Jon
STEP 1
Plan your new installation carefully.
Floor: The floor should be structurally sound
and level within 1/8". If the floor is not level,
use hydraulic cement or similar material to
level the floor.
Water: A water supply will be needed to operate
the toilet. Usually a 1/2" line with a shut-off
valve is sufficient.
Electrical: A 115 volt GFCI receptacle will
be needed to supply electrical power to the
pump.
Sewage: Access to a sewage line is required.
The Qwik Jon
Ultima requires a 1" (or 3/4" if
®
your codes permit) sewage discharge line to
connect to an existing sewage line. A ball or
gate valve should be installed in the discharge
line.
Vent: Access to a vent pipe is required. The
use of a mechanical vent system is NOT
recommended as the toilet will not flush.
NOTE: If a built-in installation is to be used,
locate the pump unit in an area that will allow
access to the pump and switch.
STEP 2
Do not use wooden shims to level the pump unit!
Ensure that nails, screws or other sharp objects do
not puncture the pump unit!
Level the pump unit to within 1/8" using hydraulic cement or
similar material.
Ultima Qwik Reference Guide
®
Location Selection
Leveling of Pump Unit
© Copyright 2012 Zoeller Co. All rights reserved.
DISCHARGE
PIPE
GFCI
OUTLET
WATER
SUPPLY
5
VENT
PIPE
BALL OR GATE VALVE
SOLD SEPARATELY.
LEVEL FLOOR
SK2588
SK2589