Installation Notes - American Standard AM4242N3400C Serie Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION NOTES:

This unit is best installed by two people.
Cover drain with tape prior to installation to prevent the loss of small parts.
Unpack your unit carefully and inspect for freight damage. Lay out and identify all parts using instruction sheet as a
reference. Before discarding the carton check to see that no small hardware parts have fallen to the bottom of the box. If
any parts are damaged or missing refer to the description noted in the instructions when inquiring about replacements.
Handle the glass panels carefully and protect the edges. Although tempered glass is very resistant to breakage the glass
can still break if unequal pressure is applied during installation and the sharp corners of the panel can damage tile and
ooring surface.
Be sure to wear safety glasses whenever drilling or cutting. When drilling holes in ceramic tile or marble use a center
punch and hammer to carefully break the glazed surface. This will prevent skidding when drilling.
NOTE: TEMPERED GLASS CANNOT BE DRILLED, CUT OR MODIFIED.
1
ATTACHING ALUMINUM SEALS TO THE THRESHOLD
1.
Assemble the three Aluminum Seals [13] together using the M4 x 8 Screws [12] and Bottom Connectors [24].
2a.
Place the assembled Seals on the shower base threshold with the edges against the wall and mark both sides
where they touch the wall.
2b.
Remove the Seals and place the Stoppers [9] in the center of the two lines drawn in 2a. Mark the locations of holes
in the Stoppers on the shower base and drill 1/4" (6 mm) holes where marked.
2c.
Insert Wall Anchors [1] in the holes and secure the Stoppers to the shower base using M4 x 25 Screws [8].
3.
Place the Aluminum Seals over the Stoppers as shown.
2
1
2
1
1a
2a
4
1b
M4x8
M 4 x 2 5
2b
3
710354 - 10 0 Rev. A 8 / 16

Publicidad

Tabla de contenido
loading

Tabla de contenido