HIDDY 350A
3. Installation HIDDY 350A

3.1 Pre-installation checks

The leaf must be fixed firmily on the hinges to the pillars, must not be
flexible during the movement and must move without frictions.
Before the installation of HIDDY 350A, verify all dimensions etc.
There's no need for any modification, if the gate is like that shown in
Fig. 1.
Gate features must be uniformed with the standards and laws in
force. The gate can be automated only if it is in a good condition and its
conditions comply with the EN 12604 norm.
- The gate leaf does not have to have a pedestrian opening. In the
opposite case it is necessary to take the appropriate steps, in
accordance with EN 12453 norm (for instance; by preventing the
operation of the motor when the pedestrian opening is opened, by
installing a safety microswitch connected with the control panel).
- No mechanical stop shall be on top of the gate, since mechanical stops
are not safe enough.
3.2 Prepare the cementation of the box
-
Excavate a trench next to the pillar (Fig. 3).
-
On the bottom of foundation box a 50 mm Ø pipe should be fitted to
drain water. On one side of the box another pipe 32 mm Ø should
be fitted. Pipe should be flexible, sturdy and insulated type, to let
out electrical wiring (use holes on internal side of gate opening).
ENSURE THAT THE CABLE JOINTS ARE MADE inside a sealed
junction box OUTSIDE.
-
Use a level to position the box so that the upper edge of the cover
corresponds with the finished floor level.
-
The centreline of the pintles must be perfectly in line with the
centreline of the operating arm mounting shaft.
-
For HIDDY 350 110° (EIM2): Cement in, taking care to ensure
that cement does not fall into the box and checking that the
short sides of the box are perfectly parallel to the gate when in
the "CLOSED" position.
-
For HIDDY 350 180° (EIM2.180): Cement in, taking care to
ensure that cement does not fall into the box and checking that
the short sides of the box are perfectly perpendicular to the
gate when in the "CLOSED" position.
-
Insert the bolts for cover fixing in places cut into the foundation box.
6
Tube for electric
cables
EN
Tube for water drain
Tube for electric cables
Tube for water drain
3
4
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Eim2.120Eim2.180Elvox eim2Elvox eim2.120Elvox eim2.180

Tabla de contenido