Configuration - Festo CPV-DI01 Serie Breve Descripción

Ocultar thumbs Ver también para CPV-DI01 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
CPV-DI01
NOTE:
Only a fully installed and wired CP system is permitted to be
started up.
2

Configuration

CAUTION:
The nodes contain electronically sensitive components.
Touching the contact surfaces of sockets and connectors
and ignoring the handling requirements for electrostatically
sensitive components may destroy the node.
To configure, proceed as follows:
1. Turn off supply voltage.
2. Remove switch module.
3. Use the DIL switches to set: Fieldbus protocol, system con-
figuration, fieldbus address/station number, diagnostic mode
(applies only to Profibus or ABB CS31), baud rate (applies
only to Festo fieldbus).
4. Reinstall switch module.
5. If the CP system is the first or last station in a fieldbus seg-
ment, the termination resistor in the Festo Sub-D plug (TN
18529) must be activated.
12
9904NH

Publicidad

Tabla de contenido
loading

Tabla de contenido