10
Install the armor plate.
11
Connect the battery cable.
Install four (4) AA batteries into the battery holder. Tuck the
cable behind the tab in the escutcheon
Electrical Ratings (6Vdc, 500mA, 3 W)
Power On Self Test (POST)
The POST is a self-diagnostic test that the lock runs to
verify that the lock is installed correctly. The POST takes
approximately 30 seconds after batteries are installed.
During the POST, a series of audible beeps and LED
flashes will occur. If the POST detects an issue, the test will
conclude with three red flashes of the outside LED. Once
commissioned with the ENGAGE mobile app, any issues
identified during POST can be viewed under the View Activity
menu.
8
12
12a Optional: Install security screw and washer.
Remove standard screw and washer and replace with
security screw and washer.
After holder
is installed,
tuck cable
behind tab.
13
Install the battery cover and tighten the screw.
Install the inside lever.
*included in box