Indoor Unit; Outdoor Unit - Haier AP24UFAHRA Manual De Funcionamiento Y Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Drawing for the Installation of Indoor and outdoor Unit
The models adopt HFC free refrigerant R32
More than 1 0cm
Back
Mor e than 1 0cm
Left
Right
More th an 1 0cm
G
Gu ard
ring
Fro nt
No barrier in the fron t
F
A
C
Left
more than 60cm
more than 30cm
Back
The marks from
A
to
G
in the gure are the
parts numbers.
D
E
more than 200cm
Rig ht
Front
more than 60cm

Indoor Unit

1.Installation of the indoor machine
Making a Hole on the Wall and Fitting the Piping Hole Cover
- Positon of the wall hole
Wall hole should be decided according to installation place and piping direction
(refer to installation drawing on the left).
- Making a wall hole
Make a wall hole with a little slope towards outside. Install the guard ring and seal it
with plaster.
- Fixed the indoor machine
The top of the machine is fastened to the wall with a metal bracket.
The whole machine is placed horizontally, and the inclination is less than 1°.
Installation of metal bracket
There is no gap between the metal bracket and the machine and
is fastened with screws (Fig. 1). After the machine is placed horizontally,
the metal bracket is connected to the wall by screws(Fig. 2).
2.Piping connection of the indoor unit
Connecting pipe, Drain pipe
Caution
1. Drain pipe placed in the lower position.
2. The drain should have a slope to avoid
convexities and depressions.
Drain
3. The drain pipe should be covered with
hose
insulation material for heat preservation in
Insulation
a high humidity environment.
material
- Open the back panel and drain pipe as shown in the Figure on the right.
- Remove the cap of the indoor unit and connect the connecting tube to the bellows
of the indoor unit.
- Wrap the connecting pipe, drain pipe and electrical connection line with
polyethylene tape. After wrapping, pass through the wall hole, and connected to the

outdoor unit.

25 5
Arrangement of the drain hose
Diameter of Copper tube(mm) Tightening torque(N.m)
Drain hose shall be placed in under place.
There should be a slope when arrange drain hose. Avoid up and
down waves in drain hose. If humidity is high, drain
pipe(especially in room and indor unit) must be coverd with
installation material.
Installation of connecting pipe
First connect the indoor unit, then connect the outdoor unit.
Connect the low pressure pipe first and then the high pressure
pipe. The nut should not be tightened too tightly to prevent leakage.
Outdoor Unit
1. Connecting the indoor/ outdoor electric cable
Removing the wiring cover
Remove terminal cover at the electrical box of indoor unit, then
take of wiring cover by remobing its screws.
When connecting the cable after installing the indoor unit
- Insert from outside the room cable into left side of the wall
hole in which the pipe has already existed
.
- Pull out the cable on the front side, and connect the cable
making a loop .
-
-
-
-
Hint:
Outdoor unit
Indoor unit
1
2
3(C)
L
N
connecting wiring
power supply
1PH,230V,50Hz
special on-off
more than 30A
L
N
(The components in the
dotted lineare user self-prepare)
Wiring method for connecting wires
After the wiring is completed, the crimping clamp must be pressed against the cable. The crimping clamp should be
pressed on the outer sheath of the line.
Extended power cord
The extension cord must use the entire power cord and cannot be connected. When the weak signal cable is lengthened,
the wiring must be staggered by 100m and soldered
.
26
Fixed the unit
First, the meta l mounting bracke t is fixed on th e wall, the expansion bolts of the
12mm. Then put the outdoor machin e flat and fixed on the stand.
Ins tallation of drainage elbow
If you use a drainag e e lbow, refer to the follo wing image to insta ll. Where the
.
Connection
Hint
Loosen the screws on terminal block and
1 Single cooler does not require this installation
insert the plugs fully into terminal block, then tighten the screws.
2 Drain elbow and drain pipe contact for sale after purchase
Insert the cable according to terminal number in the same manner as the indoor
3 Handle drainage problems when installing the outdoor unit
unit.
If wiring is not correct, proper operation can not be carried out and controller
may be damaged.
Fi x the cable with a clamp.
Attaching Drain-Elbow
If the drain- elbow is used
please attach
Purging Method:To use vacuum pump
1.
Detach the service port's cap of
10m
and 3-way's, connect the service port into the projection of charge hose (Iow)
for gaugemanifold. Then connect the projection of charge hose (center) for gau-
gemanifold into vacuum pump.
20m
2.
Open the handle at Iow in
moves of gause (Iow) reach vacuum condi tion in a moment, check 1. again.
2
Vacuumize for over 15min.And check the level gauge which should read -0.1MPa
3.
(76 cm Hg) at Iow pressure side. After the completi on of vacuumizing, close the
handle 'Lo' in gaugemanifold and stop the operation of the vacuum pump. Check
condition of the scale and hold it for 1-2min. If the scale-moves back in spite of
Caution
tightening, make aring work again, the return to the beginning of 3 .
4.
Open the valve rod for the 2-way valve to an angle of
Outdoor unit installation is not less than 2.5 meters
After 6 seconds, close the 2-way valve and make the inspection of gas leakage.
5.
No gas leakage?
In case of gas leakage, tighten parts of pipe connection. If
If it does not stop gas leakage, discharge whole refrigerants from the service
port. After aring work again and vacuumize, ll up prescribed
6.
Detach the charge hose
50 Model
72 Model
the valve rod anticlockwiseuntil hitting lightly.
Outdoor unit installation size mm
Outdoor unit installation size mm
To prevent the gas leakage, turn the service port's cap, the valve rod's cap for 2-way
7.
valve and 3-way's a little more than the point where the torque increases suddenly.
8.
After attaching the each caps, check the gas leakage around the caps.
Step 1.
Drain pipe
Drain elbow
Tube(for R32)
Length of the pipe
Refrigerant addition
Inject
10
/
refrigerant
Step 4.
according
15
200
O
Open 90
to the right
20
300
When the pipe is leng then ed, the a fter-sales installer shou ld b e equ ipped with a
profession al e vacuati on p ump to evacuate the air inside the pipe ..
Step 5.
The R32 refrigera nt injected into the new factory air con ditio ner is the net gas
injecti on amoun t. It is forbidd en to use the inte rnal ro w meth od for emptying.
To ben d a pipe , give the roundness as large as possible n ot to crush the pipe,
and th e b ending radius shou ld be 30 to 4 0mm o r lo nger.
Con necting the pi pe o f gas side fir st makes working e asi er.
The connecti on pipe is sp ecial ized for R32 .
27
Arrangement of piping directions
LEFT
BACK
RIGHT
Optional parts for piping
No n-adhesive tape
A
B
Adhesive tape
Saddle (L.S) with scre ws
C
Conn ecting electric cable
D
for indoor and outdoor
E
Dra in h ose
F
Heating in sula ting mater ial
G
Pipin g hole cover
Indoor side
Outdoor side
Thickness
Wall hole
of wall
(Section of wall hole)
Fig. 1
Fig. 2
G uard
ring
Copper
tube
Connecting el e ctric
cable(indoor&outdoor)
Bac k
panel
6
18 - 2 0
9
3 0 - 3 5
12
5 0 - 5 5
15 .8 8
6 0 - 6 5
Correct
Wrong
T erminal
row
Cri m ping
clamp
2
YZW, no less than 4*2.5mm
power cable
2
YZW, no less than 3*4.0mm
ceramic fuse:
T3.15A/250VAC(indoor)
T25A/250VAC(outdoor)
the heat pump
as gure
,
.
3-way valve, the valve rod's cap for 2-way valve
gaugemanifold, operate vacuum pump. If the scale-
anticlockwise 9 0 degrees.
leakage stops, then proceed 6. steps
refrigerant from the gas cylinder.
from the service port, open 2-way valve and 3-way. Turn
3
-
way valve Liquid Side
Step 2.
way valve Gas Side
Open
2-
Gaugemanifold(for R32
)
An
ti countercurrent joint
Step 3.
Vacuum pump(for R32)
Close
3-way valve
3-way valve
Step 6.
2 -way valve
2 -way valve
.
3-way valve
3-way valve
Step 7
2 -way valve
2 -way
valve
Valve rod cap
Valve rod cap
Service port cap

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido