T Aking The Machine Into Service - SUHNER QUILLmaster BEM 3 Documentación Técnica

Ocultar thumbs Ver también para QUILLmaster BEM 3:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
2.2.3 P
neumatic aDVance
Attach air hoses (polyurethane hoses Di=2.6mm, max.
pressure 7 bars, -35 to 60 °C ) to the installed pneumatic
connections.
Without chip removal
Stroke «forward» (1). Stroke «back» (2).
w
ith chiP remoVal
Stroke «forward» (1). Stroke «back» (2). Polyurethane
hoses Di=4mm, max. pressure 7 bars, -35 to 60 °C (3).
Release brake (4).
P
rinciPle of aDVance control
(
1-3, suhner
items
scoPe of suPly
Machining unit (1). Oil brake (2). Inductive sensors (3). Ad-
justable speed regulation check valve (4). Bistable 4/2- or
5/2-way pulse valve (5). Main valve (6). Filter (7a). Pressure
regulator (7b). Oiler (7c). Mono-stable 4/2-way valve (only
with chip removal function) (8).
2.3 t
aking the machine into serVice
2.3.1 s
troke aDjustment
Bring stroke into starting position pneumatically (connec-
tion see section 2.2.3) or by hand and remove cover.
2.3.1.1
r
aPiD traVel
The rapid travel is adjusted by means of the limit stop
sleeve and the adjusting screw.
)
25

Publicidad

Tabla de contenido
loading

Tabla de contenido