Prepare The Site - Kohler K-669 Guia De Instalacion

Ocultar thumbs Ver también para K-669:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Prepare the Site

Determine the desired location for the valve according to the
rough-in information, and construct suitable stud and support
framing.
Depending upon the valve, use 1/2" or 3/4" nominal copper
tubing and fittings throughout this installation. Smaller diameter
piping upstream or downstream of the valve will reduce
performance of the valve.
Kohler Co.
9
1041158-2-F

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-679K-670K-680

Tabla de contenido