Nogueira DPM-1 Manual De Instrucciones página 19

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

GRINDING DRY PRODUCTS WITHOUT USING THE CYCLONE
1- Place the vacuum isolator (4) - if the machine is equipped with the cyclone;
2- Place the box inner cover (1);
3- Place the sieve based on the type of final product (2) insert the most curved part first;
4- Place the moveable cover on the intake chute (3);
5- Remove the back closure (5).
The product is placed in the intake chute or
hopper and comes out from the lower chute.
CUTTING FRESH PRODUCTS
The product is placed in the intake chute and
comes out the upper outlet.
1- Place the smooth belt - cutting closure (2);
2- Remove the inner cover (1);
3- Remove the moveable cover of the intake chute (3);
4- Remove the back closure (5);
5- Place the vacuum isolator (4) - if the machine is equipped with the cyclone;
6- Open the blast stopper (6).
19
DPM-500/1/2/4

Hide quick links:

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Nogueira DPM-1

Este manual también es adecuado para:

Dpm-2Dpm-4

Tabla de contenido