Diagram Of The Operating Principle - Gree GRS-CQ8.0Pd/NaE-K Manual De Usuario

Bomba de calor aire-agua split versati
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SPLIT
TYPE

1. Diagram of the Operating Principle

Outdoor Unit
E
4
5
S
D
C
16
15
No.
Name
1
Compressor
Discharge Temperature
2
Sensor
3
High Pressure Switch
4
Pressure Sensor
5
4-way Valve
6
Finned Exchanger
Environment
7
Temperature Sensor
Defrosting Temperature
8
Sensor
9
Filter
Electrostatic Expansion
10
Valve
11
Filter
12
Liquid Valve
13
Gas Valve
14
Filter
15
Vapor-liquid Separator
Suction Temperature
16
Sensor
17
Pressure Sensor
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
7
8
6
9
10
3
11
2
12
49
1
13
14
50
17
No.
Liquid Temperature
18
Sensor of the PHE
Gas Temperature Sensor of the
19
20
Plate-type Exchanger
Leaving Water Temperature
21
Entering Water Temperature
22
23
Automatic Exhaust Valve
24
25
26
Leaving Water Temperature
27
of the Electric Heate
28
29
Leaving Water Pipe
30
Entering Water Pipe
31
32
33
Electric 3-way Valve 2
Water Tank Temperature
34
Indoor Unit
25
23
28
24
27
29
26
18
21
20
19
22
31
32
Name
PHE
of the PHE
of the PHE
Electric Heater
Safety Valve
Expansion Tank
Water Pump
Flow Switch
Connector
Connector
Water Filter
Sensor 1
7
Air-to-water Heat Pump Split Versati
Field Supplied
42
33
30
43
46
44
45
37
36
34
38
41
48
35
No.
Name
35
Water Tank
Leaving Water Temperature
36
Sensor of the Solar System
Flow Switch for the Solar
37
System
Water Pump for the Solar
38
System
39
Solar Panel
40
Solar Panel Temperature Sensor
Entering Water Temperature
41
for the Solar System
42
Water Knockout Vessel
43
Electric 2-way Valve 1
44
Floor Radiator
45
Water Collector
46
FCU
Pressure Differential Bypass
47
Valve
Water Tank Temperature
48
Sensor 2
49
Liquid Valve Connector
50
Gas Valve Connector
47
40
39

Publicidad

Tabla de contenido
loading

Tabla de contenido