Kohler Sterling NI3100 Serie Manual Del Usuario página 17

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bushing
Bushing
Inside of Shower
Pivot Side
Fixed Panel
13. Install Top "C" Frame
NOTE: Perform the procedures below from the inside of the shower.
Place the top "C" frame down over the fixed panels. Ensure the ends of the top "C" frame are
aligned with the ends of the wall jambs.
Align the holes in the top "C" frame with the holes in the fixed panel frames.
Secure the top "C" frame to the fixed panel frames with four #8-18 x 3/8" screws.
NOTE: If the top "C" frame does not align with the fixed panel holes, loosen the screws, align the top "C"
frame holes, then retighten the screws.
Install a bushing into the pivot side of the bottom "C" frame and the top "C" frame.
Install a plug on the strike side of the bottom "C" frame.
Insert a 1/8" (3 mm) thick nylon washer over the long end of the pivot pin.
Insert the short end of the pivot pin into the bushing of the bottom "C" frame.
Sterling
Top "C" Frame
#8-18 x 3/8"
Screw
Plug
Strike Side
Fixed Panel
17
1/8" (3 mm) Thick
Nylon Washer
Bottom Pivot Pin
Bushing
Bottom "C"
Frame
1034047-2-G

Publicidad

Tabla de contenido
loading

Tabla de contenido