2.5.3 - Piping connection (figure 7)
for the left (C) and right (f) piping, remove the respective pipe covering (B or G) from the lateral panel.
It is recommended to keep the pipe covering that has been removed, since it can be re-used if the
air conditioner is installed in another position.
For the rear right (E) and rear left (D) piping, install the pipes as illustrated in figure 7.
Bend the connection pipe, which must be laid at a max. distance of 43 mm from the outside wall.
fix the end of the connection pipe (i). (see "execution, installation and connection of the refrigeration lines").
Key (figure 7)
A Pipe-holder
B Pipe protection (left)
C left piping
D left rear piping
a. Attach the upper bracket present in the rear part of the indoor unit to the upper hook of the fixing bracket
(pos. 7 - figure 8).
b. Move the unit laterally to ensure it is correctly attached to the fixing hook (7).
c. Piping connection is easily performed by lifting the indoor unit and introducing cladding between the same
and the wall.
remove the cladding once connection has been completed.
d. Push the lower part of the indoor unit towards the wall to attach it to the fixing bracket (pos. 7 - figure 8).
e. try and move the indoor unit laterally and vertically to make sure that it is attached securely.
2.5.4 - Drain pipe connection (figure 9)
a. insert the drain pipe (a), making sure that it slopes downwards.
b. if necessary, connect an extension (C) to the drain pipe, isolate the joint with a protection pipe (B).
2.5.5 - Piping and protection wrapping connection (figure 10)
Evenly wrap the connection cable, drain pipe and electric cables with electrical tape, as illustrated in figure 10.
Given that the condensate water from the rear of the indoor water is collected in the "Pond Box"
tray and taken out of the compartment, do not put anything in the tray.
Key (figure 10)
A
Collection tray
B
Piping compartment
C
electrician's tape
EN - 16
E right rear piping
F right piping
G Pipe protection (right)
H indoor unit outlet
D
Connection pipe
E
Connection cable
F
Drain pipe
I
Connection pipe
L Upper hook