S
1. c
tep
alculate
The condenser unit is shipped with a predetermined factory charge level as shown below. Please follow below step. Refer to
the following page for the equivalent length of the elbow fittings.
Total refrigerant
=
charge (A)
(A) to (C) parameters are shown in below table.
The following table shows refrigerant amount for every 5 feet of line. Calculate charge amount by liner approximation in be-
tween line set length mentioned below table.
charge Table for Total refrigerant (A)
Actual Line Set Length(ft.)
Liquid Pipe Diameter(inch)
Gas Pipe Diameter(inch)
Total (A) / Additional (C)
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
r
c
efrIgerant
harge
factory charge
+
(B)
1/4"
Total (A)
Addnl. (C)
n/a
81
0
81
0
81
0
82
1
83
1
83
2
84
3
85
4
85
4
86
5
87
6
88
6
88
7
89
8
90
9
factory charge (B)
Standard Diameter
B
l
aSed on
Ine
Additional charge for line set (c)
Unit Tonnage
1.5 Ton
Total (A) / Additional (C) refrigerant (oz.)
3/8"
5/8"
Total (A)
Addnl. (C)
81
0
82
1
85
4
88
6
90
9
93
12
95
14
98
17
100
19
103
22
106
24
108
27
111
30
113
32
116
35
118
37
121
40
124
42
16
S
l
et
ength
1/4"
3/4"
Total (A)
Addnl. (C)
n/a
81
0
81
0
82
1
83
2
85
3
86
5
87
6
88
7
89
8
90
9
91
10
93
12
94
13
95
14
96
15
97
16
98
17
3/8"
Total (A)
Addnl. (C)
81
0
84
3
87
6
90
9
93
12
96
15
99
18
102
21
105
24
108
27
111
30
114
33
117
36
120
39
123
42
126
45
129
48
132
51