Important Information For Installation Of Columns; Preparation By The User; Recommended Foundations; Continuous Footing - Bosch VLE 2130 E Funcionamiento Inicial

Elevador de dos columnas
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
3.
Important information for
installation of columns
!
The substrate, the foundation and also careful
installation are of the utmost importance. Lifting
platform erection is only permissible and only to be
performed if the stipulated minimum requirements
for the foundations are satisfied at the installation
location (refer to Section 3.2). On installation,
attention is also to be paid to the information given
in the fitting instructions of the relevant connector
manufacturer.
3.1

Preparation by the user

The user must have the following work performed
before erecting the platform (refer also to planning
folder):
R
Construction of the foundation following
consultation with Bosch customer service or a
service agent authorized by Bosch.
!
The surface of the foundations must be smooth
and flat for all lifting platforms. The ground must
comply with the general guidelines for building land
(Eurocode 7, formerly DIN 1054). The ground must
be frost-proof. For erection on floors, checking must
be performed by a structural engineer on a case-to-
case basis.
R
Routing of the wiring to the installation location.
R
Routing of the compressed air connection to the
installation location (optional, only if required).
!
If the lifting platform is to be erected on a floor, the
loadbearing capacity of this must be observed. An
appropriate construction expert is to be consulted.
!
To stop vehicles colliding with the ceiling, it is
advisable to fit an overhead light barrier in low-
ceilinged buildings.
Robert Bosch GmbH
Important information for installation of columns | VLE 2130 E | 13
3.2
!
A prerequisite for proper installation is a flat, frost-
proof, horizontal concrete floor without any cracks
and with a strength class of at least C20/25. The
necessary loadbearing capacity and minimum
thickness depend on the type of foundation.
!
Verification on a case-to-case basis is required if
the lifting platform is to be anchored on an existing
reinforced concrete floor.
3.2.1
Specifications
Reinforcement, top and bottom
Required asx
Required asy
Minimum concrete thickness
Shear connector
Column spacing Y
Foundation width X

Recommended foundations

Continuous footing

Designation, value
BSt 500 M, Q131
2,57 cm²/m
3,77 cm²/m
21 cm
Hilti HVA/HAS-M16x125
257 cm
374 cm
X
Y
21
1 689 978 551
en
|
2017-11-17

Publicidad

Tabla de contenido
loading

Tabla de contenido