Use Of The Appliance - Fagor LVC-12 Instrucciones Generales Para Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

2.1.- Use of the appliance

LVR-10;LVC-12
− When the general switch is activated (1), Fig. 7, it lights up The wash drum and tub start to
fill up. When the level is reached, the water is cut off automatically.
− The cycle can be adjusted to a maximum duration of 2 minutes. Start by turning the control
(5) clockwise. The pilot light comes on during the cycle (4) (Fig. 7).
LVC-15; LVC-21
− When the general switch is activated (1), Fig. 8, it lights up. The wash drum and tub start to
fill up.
− When the pilot light comes on (2), the machine is ready.
− The cycle can be adjusted up to a maximum of 2 minutes. Start by turning the control (5)
clockwise. During the cycle the pilot light comes on (4) (Fig. 8).
− Press the switch (3) for a cold water rinse.
LVC-21B
− Set the switch (1), Fig. 9, to
will start to fill and heat up. When the pilot light comes on (3), the machine is ready.
− Start the wash cycle by pressing (4). The programme is a set one and lasts 2 minutes.
− To completely empty the tub, remove the anti-overflow device (A) (Fig. 13), set the switch
(1) to
and press button (4) (Fig. 9).
− At the end of the day set the switch (1) to the 0 setting.
LVC-15D; LVC-21D
− Set the switch (1), Fig. 10, to
up of the rinse and wash water will start.
− When the pilot light comes on (4) the machine is ready.
− The cycle can be adjusted up to a maximum of 2 minutes. Start by turning the control (6)
clockwise. During the cycle the pilot light (5) (Fig. 10) will come on.
2.2.- Regeneration of the water softener
Models LVC-15D, LVC-21D, have a water softener which should be regenerated at the end
of the day. To do this, carry out the following operations:
− Set the switch (1) (Fig. 10) to
− Remove the anti-overflow device (A) (Fig. 13).
− Press the switch (3) (Fig. 10) for a few seconds until the pilot light comes on (5)
− After about 20 minutes the pilot light will go off (5) (Fig. 10) indicating that the regeneration
cycle is complete.
− Fill the tank each week with common salt, hermetically closing the lid (T) (Fig. 11).
2.- USE
, the pilot light (2) will come on. The rinse and wash water
the pilot light (2) will come on. The filling and heating
18

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Lvc-15Lvc-21Lvc-21bLvc-15dLvc-21d

Tabla de contenido