Dustcontrol DC 11-Module Instrucciones Originales página 51

Ocultar thumbs Ver también para DC 11-Module:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 171
Installation TPR
1.
Ancor the pump to the concrete pad.
2. Remove the pump covers and assemble the
protection screen skirt if this is required (A).
3. Connect the ducting to both the inlet and the
outlet. Do not start the pump without having it
connected to the ductwork.
4. The pump inlet should always be connected to a
separator with a fi lter unit (B). The pump cannot
tolerate contaminated airfl ow .
5. Extra silencing can be installed if the outlet
sound level is to be lowered from approximately
75 dB(A) to approximately 62-64 dB(A). See
Accessories.
6. If the outlet is vertical, and exposed to the ele-
ments, rain protection should be installed (C).
Exhaust air can be very hot, up to 150
7.
Electrical connections may only be performed
by a certifi ed electrician. A separate lockable
disconnect should be installed where it is readily
accessible and within view of the pump.
8. Thermal overload protection must be installed to
validate the warranty.
9. The control panel must be equipped with an
overload protection that should be adjusted and
tested by a certifi ed electrician. Check for cor-
rect motor rotation.
O
C.
DC 11-Module - 51
Part No 94153-G

Publicidad

Tabla de contenido
loading

Tabla de contenido