Switching On From The Mains; Switching Off The Cps - Gtec Saturn Manual Del Usuario

Ocultar thumbs Ver también para Saturn:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

➢ Press
to enter the System on menu. When confirmation is requested,
press "YES", press
to confirm and wait for a few seconds. Check that
the CPS is set to the state where the load is fed by the inverter.
➢ Open the input isolating switch (SWIN) and wait for a few seconds.
Check that the CPS is set to "BATTERY" operation and that the load is
still being powered correctly. A beep must be heard about every 7
seconds.
➢ Close the input isolating switch (SWIN) and wait for a few seconds.
Check that the CPS is no longer operating from the battery and that the
load is being powered correctly from the inverter.
➢ To set the Date and Time, access menu 8.6.7 (see "Display menus").
Use the arrow keys (
↑↓
by pressing (
) to move on the next field. To save the new settings, go
back to the previous menu by pressing
S
WITCHING ON FROM THE MAINS
➢ Close the isolating switch SWIN.
After a few moments the CPS becomes active, capacitor pre-loading takes place and the "Lock / stand-by" LED
flashes: The CPS is in stand-by mode.
to access the System on menu. When confirmation is requested, select "YES" and press
➢ Press
the LEDs around the display light up for about 1 second and a beep is heard. The display shows the message
"SYSTEM ON" to inform the user of the start of the switching on sequence which ends when the CPS load is
powered by the inverter.
S
WITCHING OFF THE
From the main menu, select "OFF" and press
press
. At this point, the load is no longer powered. In order to switch the CPS completely, it is necessary to open SWIN
and the battery rack switch/fuse. Wait for a few seconds until the display goes off.
N.B. during extended periods of inactivity, it is good practice to switch the CPS off by opening the input and
output isolating switches. Finally, once the CPS is off, open the battery fuse holders.
) to set the required value, and finally confirm
.
CPS
to enter the submenu. Then select the option "YES – CONFIRM" and
85
again to confirm. All

Publicidad

Tabla de contenido

Solución de problemas

loading

Productos relacionados para Gtec Saturn

Tabla de contenido