Kohler 5714-VBW-0 Guia De Instalacion página 16

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

24"
(610 mm)
10"
(254 mm)
7. Complete the Finished Walls
Cover the framing with water-resistant material.
Provide suitable access to the control amplifier.
Install the finished wall and deck materials.
Drill a 5/8" (16 mm) hole through the wall material where the user interface will be installed. Refer
to the "Installation Sequence" section for the recommended location.
Route the user interface cable through the hole in the wall material, and tape or otherwise secure
the cable so it will not fall between the walls.
IMPORTANT! Kohler Co. strongly recommends the use of 100% silicone sealant as instructed. Other
sealants with high filler contents should be avoided, as they may shrink, separate, and peel over time.
Seal the joints between the bath rim and the finished deck with a 1/8" (3 mm) bead of 100% silicone
sealant.
Install the faucet trim.
1297610-2-B
5/8" (16 mm) User
Interface Hole
Apply 100% silicone
sealant.
16
Finished Material
100% Silicone
Sealant
Water-Resistant
Deck Material
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

5714-vb-ny5714-vbw-96

Tabla de contenido