Kohler 5714-VBW-0 Guia De Instalacion página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Prepare the Site (cont.)
Construct stud framing or a pocket for the control amplifier.
Provide a means to route the user interface cable through the wall to the control amplifier.
Plumbing
NOTE: For through-the-floor drain installation: cut a hole in the subfloor to accommodate the drain
connections.
Install the rough drain and water supply plumbing.
Cap the supplies and check for leaks.
Attach the drain to the bath according to the instructions packed with the drain. Do not connect the
trap at this time.
Kohler Co.
9
1297610-2-B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

5714-vb-ny5714-vbw-96

Tabla de contenido