Broan Best IS502 Manual Del Usuario página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

METAL BAR ASSEMBLY
1. Slide insulators over each of the (4)
metal bars. Fig. 16.
2. Insert an end of each metal bar into
the electrical connectors that exit the
hood flue. Guide the wire and con-
nector into the oval hole of the lower
flue side. Fig. 17.
3. Slide insulators up the metal bars
until they seat and fill the oval hole of
the flue. Fig. 17.
4. Install the opposite end of the metal
bar into the support post located on
the outer edge of the hood. Fig. 17.
5. Secure the metal bars to the support
posts by tightening setscrews with
hex key provided. Fig. 17.
LAMP ASSEMBLY
1. Remove screws from the adjustment
2. Position the lamp between both metal
ELECTRICAL
CONNECTOR
INSULATOR
NOTE: Avoid touching metal bars si-
FIG. 16
multaneously with metal objects. Do-
ing so will cause fuse to open and lamp
operation failure. See page 5 for fuse
replacement instructions.
METAL BAR
SUPPORT
POST
FIG. 17
- 10 -
slides. Position one slide on each
lamp post as shown. Fig. 18.
bars and move lamp to its desired
location. Reinstall adjustment slide
screws and tighten set screws with
hex key provided. Fig. 19.
ADJUSTMENT
SLIDE
REMOVE THE
SCREWS
LAMP
FIG. 18
PLACE THE
LAMPS BETWEEN
THE METAL BARS
FIG. 19

Publicidad

Tabla de contenido
loading

Tabla de contenido