Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

HOOD ASSEMBLY

To avoid breakage, do not hit glass
with metal, glass, porcelain or other
heavy objects.
1. Fasten the discharge collar to the
blower support with (2) sheet metal
screws. Be sure the collar does not
extend beyond the blower support
edge. Fig. 9.
2. Install 6" round metal duct, long
enough to reach ducting in ceiling.
Duct tape all connections, making
them secure and air tight. Fig. 9.
3. Attach Support Frame to the Blower
Support and secure with (4) washers
and hex nuts. Make sure the edges
marked "FRONT" align. Fig. 10.
4. Determine distance between the
hood filter and cook top. Follow the
chart to adjust support frame to the
proper length. Secure both halves
together with (4) sheet metal screws.
Fig. 11.
SHEET
METAL
SCREWS
CEILING
24"
HEIGHT
23-5/8"
8 FEET
9 FEET
6"
ROUND
DUCT
SHEET METAL
FIG. 9
- HOOD DISTANCE ABOVE COOK TOP -
25"
26"
- SUPPORT FRAME LENGTH -
22-5/8"
21-5/8"
N/A
- 8 -
FRONT
FRONT
HEIGHT
ADJUSTMENT
SLOTS
SCREW
27"
28"
N/A
32-5/8"
31-5/8"
SUPPORT
FRAME
HEX NUT
WASHER
BLOWER
SUPPORT
FIG. 10
SUPPORT
FRAME
LENGTH
FIG. 11
29"
30"
30-5/8"
29-5/8"

Publicidad

Tabla de contenido
loading

Tabla de contenido