INSIDE MOUNT (IM)
STEP 1: MARKING THE BRACKET LOCATIONS
IMPORTANT: Before marking bracket locations, ensure that your bracket placement
will not interfere with any components inside the headrail.
•
Verify that your window casing has a minimum depth of
partially recessed headrail mount.
•
If flush mount (fully recessed mount) is desired, a minimum mounting depth of
2
⁄
" is required.
1
4
•
Mark 1 - 2" from each jamb for bracket location.
•
With a pencil, mark the longer, oblong drill hole locations through the top of the
holes of the bracket, 2 holes per bracket.
•
If more than two installation brackets come with your order, space additional
bracket(s) evenly between the two end brackets, no more than 30" apart, and
mark drill hole locations.
Bracket
Bracket
INSTALLATION
⁄
" which allows for a
5
8
Corded Lift Control
9