open Circuit Breaker
5.3 perIoDIC InSpeCtIon
Monthly periodic inspections are recommended to assure the useful life of the circuit breaker.
Below are items to be inspected and recommended procedures.
external Appearance
Items
Dust and debris
Visual inspection
Power
Verification of
connections
tightening torque
Flooding or
immersion in
Visual inspection
water
Control
Verification of
connections
tightening torque.
General state of
Visual inspection
cirucuit breaker
power Contacts
Items
Power contacts
Visual inspection.
Power contacts
Visual inspection.
Claws of the
Visual inspection.
removal carriage
Insulation
See page 67.
resistance
68 | ABW
Method of
Inspection
There must not be dust or
debris deposited on the
circuit breaker.
Screws must be tightened
with torque of 60 Nm.
The circuit breaker must
not be used after the
occurrence of flooding or
immersion.
Bolts must be tightened
with torque of 1.0...1.2 Nm.
There must not be
cracks, damage and/or
deformations on the front
lid and base of the circuit
breaker.
Method of
Inspection
There must not be
discoloring of the contacts.
There must not be dust or
debris on the contacts.
There must not be
discoloring of the claws or
deformations in the spring.
See page 67.
Criteria
Criteria
English
recommended
procedures
Removal of dust and debris
with vacuum and dry cloth.
Retighten with 60 Nm
torque.
Replacement of circuit
breaker.
Retighten with
recommended torque.
Replacement of the lid or, in
the case of damage at the
base, replacement of the
circuit breaker.
recommended
procedures
Replacement of the circuit
breaker in the case of
discoloring.
Cleaning of contacts.
Replacement of removal
carriage.
Replacement of circuit
breaker in the case of low
insulation resistance.