Descargar Imprimir esta página

Rack-Mount Considerations; System Setup - LG PCS400R Servidor Pro:Centric Instalación Y Configuración

Publicidad

Idiomas disponibles

Idiomas disponibles

Rack-mount Considerations

A. Elevated Operating Ambient
If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack
environment may be greater than room ambient. Therefore, consideration should be given to installing the
equipment in an environment compatible with the maximum ambient temperature (Tma) specified by the
manufacturer (see Specifications information in this document).
B. Reduced Air Flow
Installation of the equipment in a rack should be such that the amount of air flow required for safe operation
of the equipment is not compromised. To ventilate the system normally and avoid overheating, leave at least
1 inch (2.5 cm) on each side (including top and bottom) of the PCS400R. Do NOT stack other equipment on
the top of the PCS400R unit. Also, ensure that the unit's AC power adapter is never stacked or bundled with
other AC power adapters. Each adapter should have adequate ventilation and should be isolated from other
heat sources.
C. Circuit Overloading
Consideration should be given to the connection of the equipment to the supply circuit and the effect that
overloading of the circuits might have on overcurrent protection and supply wiring.
D. Reliable Earthing
Maintain reliable earthing of rack-mounted equipment. Particular attention should be given to supply
connections other than direct connections to the branch circuit (e.g., use of power strips).
E. Mains Outlet Earthing
The apparatus with Class I construction must be connected to a mains socket outlet with a protective
earthing connection.

System Setup

Refer to the following diagrams, and complete the system installation as described on pages 20 to 23.
* Caution: Do not make system connections until instructed to do so during the system instal-
lation procedure. In some instances, configuration steps must be performed before physical
connections are made.
15

Publicidad

Capítulos

Solución de problemas

loading