EN
Operation
Welding with the Geberit
electrofusion machine ESG
light
The Geberit electrofusion machine
ESG light is equipped with an
automatic mechanism which
prevents a double weld when a
coupling connection cable is
connected.
The required welding time is
adjusted automatically in accordance
with the ambient temperature.
Prerequisite
–
Pipes, fittings and welding joints are dry
and free of dirt.
–
Pipes and fittings are prepared in
accordance with the installation manual
for Geberit electrofusion sleeve
couplings.
–
Pipe surfaces are prepared in
accordance with the installation manual
for Geberit electrofusion tape for anchor
point.
22
WARNING
Danger of fatal electric shock
4 Do not weld wet or water-filled
pipes.
4 An isolation transformer must
be included in the circuit when
carrying out electrofusion work
in damp areas.
4 Allow the Geberit electrofusion
sleeve coupling or Geberit
electrofusion tape to cool down
before conducting a secondary
welding procedure.
CAUTION
Risk of injury from burns
4 Do not touch the electrofusion
sleeve coupling or
electrofusion tape, plug
contacts and pipe during the
welding procedure or during
the cooling-down phase.
ATTENTION
Leaking connection caused by faulty
welding
4 The pipe to be welded must be kept in a
tension-free position during the welding
procedure and the cooling-down phase.
4 Air draughts through the pipe interior
must be avoided.
18014400775144843-1 © 10-2017
967.779.00.0 (00)