How To Install; Unpacking The Air Conditioner; Preparing The Air Conditioner - Haier ESAQ406P Guía De Uso Y Cuidado

Aire acondicionado de uso doméstico
Ocultar thumbs Ver también para ESAQ406P:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

UNPACKING THE AIR CONDITIONER

When moving or lifting the air conditioner, use two or more people.
Wear gloves when handling the air conditioner to protect against
REMOVE PACKAGING MATERIALS
Remove packaging materials. Save the carton and the foam packaging for storing the unit when
not in use.
NOTE:
open the cabinet.
Handle the air conditioner gently.
Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back
or upside down.
The air conditioner must be standing upright for 2 hours prior to installation and operation.

PREPARING THE AIR CONDITIONER

INSTALL TOP CHANNEL
3/8" Screw
1. Place the top channel on the top of the air conditioner, lining up
the holes in the top channel with the holes in the top of the unit.
Make sure the channel is facing forward as indicated by the
illustrations. See ig.
2. Using 3/8" self-tapping screws, attach the top channel to the top
of the air conditioner. See ig.8
Use four (4) 3/8" self-tapping screws for models:
ESAQ406P & ESAQ408P
PAGE 10
WARNING
EXCESSIVE WEIGHT HAZARD
possible sharp edges and metal fins.
Front
Top Channel
8

HOW TO INSTALL

Fig. 7
Fig. 8

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Esaq408p

Tabla de contenido