Installation Instructions - Westfalia 313 404 Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
Available Spare Parts for Towing Bracket
Spare Part No.
913 146 650 001
942 076 615 001
932 065 605 001
921 259 608 101
900 001 503 587

Installation Instructions:

1.)
Specify the cross pipe position.
2.)
Specify the positioning of this on the longitudinal member using the side piece "2".
(Note: The hole pattern for the DB Atego is already present in the longitudinal members.)
3.)
Transfer the holes "a" to the longitudinal members and drill out with Ø 13 mm dia. bit.
4.)
Premount the side parts "2" on the longitudinal members.
5.)
Premount the cross pipe "1" on the side parts "2" with the clamps "3". The drilling pattern "b"
must be positioned symmetrically to the vehicle centre axis when doing so.
6.)
Drill through the lower wall of the cross pipe "1" with an Ø 11 mm dia. bit at the points "d". Push
the shackles "4" into the ends of the cross pipe and screw on at "d" with the clamp "3" and
cross pipe "1".
7.)
Finally, align the towing bracket and secure all screw fittings with the specified torque.
Point "a" M12 x 1,25;
Point "b" M10;
Point "c" M 16;
Point "d" M10;
8.)
Secure the electrical socket bracket "5" at point "e".
9.)
Mount the plugs "18" in the ends of the cross pipe on the right and left.
Subject to change.
Description
Mounting parts items 6-17, 19
Clip item 3
Shackle item 4 (2x)
Electrical socket bracket item 5
Sealing plug item 18
10.9
95 Nm
10.9
55 Nm
8.8
170 Nm
8.8
40 Nm
GB
25

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

313 146

Tabla de contenido