EdilKamin BIJOUX Instalación Uso Y Mantenimiento página 40

Ocultar thumbs Ver también para BIJOUX:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 86
COVERING INSTALLATION BIJOUX
PHASE B
g. 5
44
47
g. 6
g. 7
PHASE B
RIGHT SIDE CERAMIC PANEL ASSEMBLY (HANDLE SIDE):
Fig. 5
• Open the hearth door
• Align the apertures present on the front part of the ceramic panel (47) to the faste-
ning brackets (44) located on the structure ( g. 5).
• Insert the ceramic panel in the brackets
Fig. 6
• Rest the rear part of the ceramic panel on the galvanised side of the boiler-stove
and back on the rear ceramic fastening pro le.
• Close the hearth door.
Fig. 7
• Check that there is enough usable space between the side ceramic panel and the
hearth door to permit easy opening with the handle, and if there is no such space,
disassemble the ceramic panel and adjust as follows:
- loosen the upper bracket and lower bracket screws
- adjust the brackets "just enough"
- tighten the bracket stop screws
• Reassemble the ceramic panel according to the sequence from points 5 to 6; once
suitable ideal space is reached between the ceramic panel and the hearth door,
complete assembly sequence.
• Reposition the upper side cast iron front panel (51)
• Reposition the rear fastening ceramic right pro le (82)
Note: silicone pads have been supplied to be used for any alignments between the
ceramic panel and cast iron parts, where 3 pads are to be placed at an equal distan-
ce on the base of the lower cast iron front panel.
LEFT SIDE CERAMIC PANEL ASSEMBLY:
Fig. 5
• Keep the hearth door closed
• Align the apertures present on the front part of the ceramic panel (47) to the faste-
ning brackets (44) located on the structure.
• Insert the ceramic panel in the brackets
Fig. 6
• Rest the rear part of the ceramic panel on the galvanised side of the boiler-stove
and back on the rear ceramic fastening pro le.
Fig. 7
• If necessary, adjust the fastening brackets as per point 9
• Reposition the upper side cast iron front panel (49)
• Reposition the rear fastening ceramic right pro le (82)
Note: silicone pads have been supplied to be used for any alignments between the
ceramic panel and cast iron parts, where 3 pads are to be placed at an equal distan-
ce on the base of the lower cast iron front panel
- 40
-

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

CameoStrassTresor

Tabla de contenido