EdilKamin BIJOUX Instalación Uso Y Mantenimiento página 44

Ocultar thumbs Ver también para BIJOUX:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 86
COVERING INSTALLATION STRASS/CAMEO
PHASE A
PHASE B
PHASE C
ASE 3
142
D
A
151
140
47
141
D
151
A
140
151
B
47
B
151
C
42
C
PHASE D
PHASE A
This phase presents the boiler-stove after being unpacked and positioned in the
room
PHASE B
• Remove the front panel (69) to remove the two screws holding the upper right
(51) and left (49) cast iron front panels
69
PHASE C/D
• Assemble the plates (140) to the stone sides "A-B" (47) with TE M 6x12 screws
142
supplied and point in the 4.2 x 9.5 self-tapping screws without tightening them to
D
141
D
A
the two front and rear locking brackets (141-142-152-153) to the structure.
A
140
• Now insert the stone side (47), rst inserting it in the rear part "C" and then tur-
47
ning it and resting it on the upper part, tting it in the front bracket "D" (141-152).
47
• Now tighten screws, which were previously pointed in, on the front and rear
140
151
B
C
locking brackets (141-142-152-153).
C
43
Note:
During the assembly phase of the stone series, check that the stones are aligned
with the cast iron top. If they are not, or rather they are within a few mm, a at
washer must be placed between the side stone and the centring bracket (151) to
compensate for the indentation of the coating.
- 44
-

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

CameoStrassTresor

Tabla de contenido