General Setup - Mettler Toledo M100 Guía De Configuración Rápida

Ocultar thumbs Ver también para M100:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 59
6

General Setup

Configuration tool or asset-management tool
h
10
You configure the M100 transmitter either via a configuration tool, an asset-manage-
ment-tool or via a HART handheld terminal.
Prerequisite: The M100 transmitter and the sensor are mounted and electrically con-
nected.
Note: The DTM and the configuration tool PACTWare™ are on the supplied CD-ROM.
You can also download the DTM via Internet "www.mt.com/M100".
For steps 1 to 5 refer to the documentation about the tool.
1.
Install configuration tool e.g. PACTWare™ or asset-management-tool.
2.
Install DTM for HART interface and DTM for M100 transmitter.
3.
Update device catalog.
4.
Build up connection. Check COM port settings if necessary.
Set Tag or/and Long tag.
5.
Menu path: Device Setup > Detailed Setup > HART Info
6.
Set Date and Time. Set the time in the 24 hour format. The time format can-
not be changed. Menu path: Device Setup > Detailed Setup > System
7.
Set range of the analog output signal.
Menu path: Detailed setup > Output Condition > Analog output > Range
URV (Upper range value) and LRV (Lower range value), can be changed
to the current measurement range
USV (Upper range sensor) and LSV (Lower range sensor), defined by the
sensor and cannot be changed
Define the process variables PV, SV, TV and QV
8.
Menu path: Device Setup > Detailed Setup > Measurements > Channel Setup

Publicidad

Tabla de contenido
loading

Tabla de contenido