Tools and Materials
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Before You Begin
Please read all instructions before you begin.
Shut off the main water supply.
Observe all local plumbing and building codes.
Products purchased separately may change valve placement and
alignment.
These instructions cover two methods of installation: installation
on finished deck or rim, and installation on rough (unfinished)
deck. Follow the sections and directions that pertain to your
installation.
Provide an access panel to the valves for servicing.
Installer-supplied copper tubing is to be: 5/8" O.D. (1/2" Nom.).
Install water hammer arrestors in the supply lines near the
valves.
Plaster guard diameters are approximately 1-7/16" (3.7 cm) for
the valve, and 13/16" (2.1 cm) for the spout.
The finished deck material must fit closely to the diameters of the
plastic guards.
114183-2-CB
2
Kohler Co.