J.P. SELECTA RE-610 Manual De Instrucciones página 45

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.2.8  
Solid charging port sealing kit installation 
Please install it according to figure 2.2.8.
2.2.9  
Constant‐pressure funnel and feeding port valve installation 
Please install it according to figure 2.2.9. 
Figure 2.2.9 Constant‐pressure funnel and valve installation 
 
 
Figure   
2.2.8    Solid charging port sealing kit installation
6      Reactor lid 
24    Valve 
25    Constant‐pressure funnel 
26    Plug 
43    Rubber bracket 
6    Reactor lid 
27 Solid charging port seali
kit 
52 Connecting nut 
53  Connecting  retainer 
ring 
54 Connecting bolt 
 
45

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

1001722

Tabla de contenido