Kohler K-8549 Manual De Instrucciones página 13

Ocultar thumbs Ver también para K-8549:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Handshower
Head
8. Installation Checkout
Complete the installation of the valve, valve trim and any other
components according to the instructions packed with the
product.
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks. Repair as
needed.
Open both hot and cold valves and run water through the spout
(if installed) to remove debris. Check for leaks.
Check the handshower for smooth operation.
Confirm proper diverter operation.
Turn the cold and hot handles off and then on. Verify that the
water flow is diverted back to the spout and that the handshower
is off.
Turn the valves off.
Kohler Co.
Outer
Ring
13
113290-2-BB

Publicidad

Tabla de contenido
loading

Tabla de contenido