Descargar Imprimir esta página

Valley 30210 Instrucciones De Instalación página 3

Publicidad

through the vehicle body.
6. Route 4-flat connector thru the pictured grommet (fig.2)
by cutting a slice in the grommet deep enough to allow the
wire to pass thru and still be protected from the sharp metal
edges of the vehicle. Then attach 4-flat connector to the trailer
hitch with provided cable ties.
7. Disconnect the vehicle's Negative(-) battery cable.
8. Route the 12 gauge black wire from the battery
compartment under the vehicle along the frame through the
grommet that was used to route the 4-flat connector
Secure the wire to the vehicle using the cable ties provided.
Caution: When routing wire through metal or other sharp
surfaces,always utilize an existing grommet, provide a
grommet or insulate the wire from the hole with silicone
rubber.
9. Strip 5/16" of the insulation from the end the inline
fuseholder(included) and attach the 3/8" ring terminal using a
crimping tool.
10. On the other end of the fuseholderstrip 5/16" of the
insulation and crimp the yellow butt connector provided and
attach it to the 12 gauge black wire.
11. With the fuse removed, attach the 3/8" ring terminal to
the vehicles positive(+) battery terminal and attach it to
the 12 gauge black wire.
Warning: Do not attempt to connect the black power wire
to the vehicle fuse panel or any other accessory wiring.
Failure to connect directly to the vehicle battery could
cause vehicle damage and/or trailer lighting failure.
12. At rear of the vehicle, strip 5/16" of insulation from the
black 12 gauge wire and connect it to the black wire using

Publicidad

loading