Programming And Startup; Connection To The Power Supply And Checking Of Turning Direction; Controls And Commands - Erreka PUMA PUS400EC Manual Del Instalador

Ocultar thumbs Ver también para PUMA PUS400EC:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

PROGRAMMING AND STARTUP

1

CONNECTION TO THE POWER SUPPLY AND CHECKING OF TURNING DIRECTION

The correct operation of the operator and of the
complete system will only be achieved after
programming. However, prior to programming, it is
necessary to carry out the checks listed below.
Before carrying out any gate movement,
ensure there is no person or object in the radius
of action of the gate and the drive mechanisms.
Limit switches configuration (DIP9)
DL6
2

CONTROLS AND COMMANDS

SW1
Main switch
SW2
Programming DIPs
MARCHA
Total start mini-pushbutton
PEATONAL Pedestrian start mini-pushbutton
All manuals and user guides at all-guides.com
1 Connect the control panel power supply.
2 Check the turning direction of the operator using
The limit switches must be configured in accordance
with the operator assembly position with regards to the
leaf:
• When the gate opens to the right (detail A), place
DL6
• When it opens to the left (detail B), place DIP9 in
Proceed as follows to check the configuration:
• Place a magnet on FCC: DL6 should come on.
• Place a magnet on FCA: DL7 should come on.
(start)
(pedestrian)
CERRAR
ABRIR
T.ESPERA Standby time regulation (0-90 seconds)
R.PAR
the mini-pushbuttons PUL1 (close) and PUL2 (open).
If the turning direction of the operator is not
correct, interchange the connection cables (black
cables) in their corresponding connector (see
"Electrical connections" on page 51).
DIP9 in ON.
OFF.
Close mini-pushbutton
Open mini-pushbutton
(only functional in automatic mode)
Torque adjustment
PUMA operator for sliding gates
English
(close)
(open)
(Standby)
( T o r q u e
adjustment)
53

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Puma pus400ecm

Tabla de contenido