Installation; Necessary Tools; Initial Conditions And Checks; Environmental Conditions - Erreka VULCAN Manual Del Instalador

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION

1

NECESSARY TOOLS

Set of screwdrivers
Fixed wrenches
Socket wrench (8 mm)
Set of Allen keys
Pincers for Faston terminals
2

INITIAL CONDITIONS AND CHECKS

Initial conditions of the gate
Check that the size of the gate is within the
admissible range of the operator (see the
technical characteristics of the operator).
If the gate to be automated has a passage gate,
install a safety device to prevent the operator
from operating with the passage gate open.
The gate must have an in-ground central stop and
an in-ground stop in opening.

Environmental conditions

This device is not suitable for installation in
inflammable or explosive environments.
Electrical power supply installation
The electrical connections shall be made in line
with the instructions in the control panel
manual.
All manuals and user guides at all-guides.com
Marker pencil
Level
Tape measure
Welding machine
• This must be balanced, in order to ensure the effort
• There should be no stiffness throughout its travel.
Use the welding machine in line with the use
instructions.
The gate must be easy to manipulate manually,
namely:
made by the motor is minimum.
Do not install the operator in a gate which does
not work correctly in manual operation, as this
may lead to accidents. Repair the gate before
installing.
Check that the admissible environmental
temperature range for the operator is suitable
for the location.
The electrical cable section is indicated in: "Fig. 1
Elements of the complete installation" on page 47.
English
VULCAN hydraulic operator
53

Publicidad

Tabla de contenido
loading

Tabla de contenido