support@nextlevelracing.com
21
Bolt through the pre-drilled hole on the overhead angle members into the overhead angle plates
previously installed in step 19
22
Adjust the overhead angle members to your desired angle and bolt them into T-Nuts previously in-
stalled in step 20a(2) to lock them in place.
PARTS:
2 X M8 40MM BOLT
2 X M8 WASHER
2 X M8 FLANGE NUT
PARTS:
2 X M8 16MM BOLT
2 X M8 WASHER
TIPS:
Adjust angle of overhead mount
and tighten when in position
26
00
23
Attach your screen to the overhead cross member bolt through vesa bracket into T-nuts previously
Main text descrition for step here
installed in step 20a(1) (see step 07a and 07b for vesa assembly)
24
00
Adjust your screen to desired position
Main text descrition for step here
Video Instruction: bit.ly/nlrbuild
PARTS:
2 X M8 16MM BOLT
2 X M8 WASHER
TIPS:
Get a friend to help you hold the
monitor in place whilst securing
Refer to 7b for vesa mount assembly
PARTS:
PARTS:
NIL
Parts List here
TIPS:
Text for hints and tips for building
this step
27