Wireless Monitor Operation
1. Remove battery access cover (A) on back of the
monitor and install 2 AA batteries. (Observe correct
battery polarity which is embossed in the bottom of
the battery compartment). Replace battery access
cover.
generator ready
generator power
service needed
system update
DEALER NAME
DEALER PHONE
2. The wireless monitor does not have an on/off
switch. When batteries are installed correctly, the
GENERATOR READY green LED light will flash
once every 7 seconds indicating the status of the
generator.
NOTICE If communication does not begin upon placing
the generator in AUTO, installing batteries, and pressing
System Update, the monitor may need to be re-linked. To
link, follow Steps 3 through 6.
3. Locate the MENU AND ESCAPE buttons on the
control panel (B). Press and hold for about 3
seconds to enter the linking mode.
B
B
AUTO
# of flashes
service needed
1 low battery voltage
5 low frequency
2 low uid level
6 engine overspeed
3 under/over voltage
7 high temperature
4 engine does not start
8 transfer switch
part #: 316196 fcc id: MCQ-XBS2C IC id: 1846A-XBS2C
A
MENU
ESC
OFF
MANUAL
4. "LINKING MODE" will scroll across the generator
control panel.
5. Locate and hold the SYSTEM UPDATE button (C)
on the wireless monitor while installing the batteries
until all 3 LEDs turn on solid. All 3 LEDs will stay on
solid until the monitor links to the generator. Once it
links, the monitor will display the current state. The
monitor will try to link for 1 minute. (This step can
only be completed when the generator is in Linking
Mode).
C
6. Once the link has been confirmed, press the OK
button on the generator control panel to exit or the
control board will automatically turn off linking after
5 minutes. The generator will now communicate
with the wireless monitor.
NOTICE It may take up to 1 minute for the monitor to
begin displaying the generator status correctly.
generator ready
generator power
service needed
system update
generator systems
DEALER NAME
DEALER PHONE
21