TESTING AND COMMISSIONING

6
TESTING AND COMMISSIONING
These are the most important phases of the automation's
construction, as they ensure maximum safety of the system. The
test can also be used to periodically verify the devices making
up the automation.
m
Testing and commissioning of the automation must
be performed by skilled and qualiied personnel,
who are responsible for the tests required to
verify the solutions adopted according to the risks
present, and for ensuring that all legal provisions,
standards and regulations are met, in particular
all the requirements of the EN 12445 standard,
which deines the test methods for checking gate
automations.
The additional devices must undergo speciic testing, both in
terms of their functions and their proper interaction with the
control unit. Refer to the instruction manuals of the individual
devices.

6.1 TESTING

To run the test:
verify that all the instructions stated in the "GENERAL
1.
SAFETY WARNINGS AND PRECAUTIONS" chapter
have been strictly observed
check that the boom is correctly balanced (see paragraph
2.
"Boom balancing")
check that the manual unlocking device works properly
3.
(see paragraph "Manually unlocking and locking the
gearmotor")
using the control devices (transmitter, control push-button,
4.
key selector, etc.), test the boom opening, closing and
stopping phases, ensuring that the movement matches
the speciications. Several tests should be conducted
to assess the boom's movement and to check for any
assembly or adjustment defects or any particular points
of friction
68 – ENGLISH
verify the correct operation of all the safety devices
5.
present, one-by-one (photocells, sensitive edges, etc.)
verify the correct operation of the photocells in the
6.
following way:
– depending on whether one or two pairs of photocells
have been installed, one or two blocks of rigid
material (e.g. wooden panels) are required, measuring
70x30x20 cm. Each block must have three sides of
relective material (e.g. mirror or glossy white paint),
one for each dimension, and three sides of opaque
material (e.g. matt black paint). To test the photocells
positioned 50 cm above the ground, the block must be
placed on the ground, or raised to 50 cm when testing
photocells positioned 1 m above the ground
– if the test is on a pair of photocells, the testing block
must be placed directly under the centre of the boom
with the 20 cm sides facing the photocells and moved
along the entire length of the boom
39
– if the test is on two pairs of photocells, the test
must irst be performed individually for each pair of
photocells using one testing block and then repeated
using two testing blocks; each testing block must be
positioned laterally in relation to the centre of the boom,
at a distance of 15 cm and then moved along the entire
length of the boom
40
2 0 0
2 0 0
3 0 0
3 0 0
2 0 0
3 0 0