Etac molift Mover 300 Manual De Usuario página 8

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 116
Molift Smart 150 / www.etac.com
Charge the battery. The battery must not be in
the battery holder during assembly!
Lifting column
Place lifting column in chassis. Make sure that
the red arrow on the lower part of the column
corresponds with the edge of chassis.
Make sure screw on column is inside the hole
on chassis. This will prevent the column from
unintentionally being lifted out of chassis when
lock handle is pushed down.
Fix the column by pushing the lock handle on the
back all the way down.
Mounting sling bar
Turn connection point on lifting arm in top
position.
Insert bolt on sling bar in connection point to
mount sling bar. When bolt is completely inside
the sling bar is mounted and can rotate freely.
All manuals and user guides at all-guides.com
Assembly
Battery and hand control
1.
2. Insert battery.
3. Connect hand control wire to push handle so
Checklist after assembly
Use this checklist to verify that the lifter is properly
installed and can operate correctly and safely
before use.
8
1
2
Connect hand control to bottom of battery
holder.
it does not fall to the floor when dropped.
Do not start using lifter before
completing control according to
checklist after assembly.
Ensure that the lifting arm, lifting column and
sling bar are properly fixed and that there are
no loose parts on the lifter.
Make sure battery is charged (no lights on the
battery lamps).
Check that the lifter has no apparent damage
or other faults.
Perform one lift with load (60-80 kg)
3

Publicidad

Tabla de contenido
loading

Tabla de contenido