Descargar Imprimir esta página

Leuze electronic MLDSET-M1 Manual De Instrucciones página 12

Ocultar thumbs Ver también para MLDSET-M1:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
1
MLDSET components (included in delivery):
UDC-yy00-S2
1
MLD530-RT2M or MLD530-RT3M muting transceiver
2
MLD-M002 oder MLD-M003
3
SET-AC-MTX.2-2S (T shape)
4
SET-AC-MTX.2-2SA (L shape)
5
AC-SCM5-BT
6
Fastening anchor W-FA/S
6
BT-P40 clamp bracket
Drilling template
Connection cable in the correct lengths (machine interface) for the MLD530 must
be ordered separately!
NOTE
Carefully follow all notices regarding the safety sensor in the
enclosed documentation or in the original operating instructions on
our website.
2
Mounting steps:
1.
Fasten the columns on the floor
2.
Adjust columns
3.
Fasten and align the Muting Sensor Sets
4.
Establish the electrical connection
5.
Align and start up MLD530 muting transceiver
6.
Start up Muting Sensor Sets
Checklist - before the initial start-up
7.
Edit the
of the safety sensor)
Necessary tools:
Allen key set
Hexagon wrench set
Level
Hammer drill with 10 mm concrete bit
Hammer
Cross-head screwdriver
(see original operating instructions
EN
12

Publicidad

loading

Este manual también es adecuado para:

Mldset-m2