C
B
A
Distance from the
load's center to the
lifting carriage
25 cm
A
(0.82')
30 cm
B
(0.98')
40 cm
C
(1.31')
50 cm
D
(1.64')
For large forks:
60 cm
E
(1.97')
Security system ALS / ILS
The TL-063 incorporates the ALS securi-
VMB red trigger system automatically
in. Each section of the lift has an ALS that
PRO LIFTS S.L.
Diagram 4.6.1
E
D
Maximum load
TL-063
ENGLISH
4.7 - Elevation:
tems enable the lift to rise and automati-
rising ensuring that it will never fall. This
enables the cable to be without any force
and means it is only used for the elevation
and descent of the lift. The SRS (Sequen-
ce-Retainer-System) will also ensure that
other.
4.8 - Hold:
The tower can be left in any intermediate
position if it is necessary. Just stop turning
the handle of the winch and gently turn it
strain applied on the cable.
4.9 - Lowering:
1
(N
) and at the same time pull the red
ALS-1) out. This releases the
been completely lowered. All red ALS
ALS-2, ALS-3 & ALS-C) should be
pulled out one by one whilst the handle is
are brought down, one by one.
Depósito legal y copyright. Todos los derechos reservados.
N
2
N
2
), whilst maintaining the
N
2
N
1
) to lift
-
10