Installation; Lifting Instructions - ESAB Warrior Feed 304 Manual De Instrucciones

Ocultar thumbs Ver también para Warrior Feed 304:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

US
7

INSTALLATION

The installation must be done by a professional.
WHEN WELDING IN AN ENVIRONMENT WITH INCREASED ELECTRICAL DANGER,
ONLY POWER SOURCES INTENDED FOR THIS ENVIRONMENT MAY BE USED.
THESE POWER SOURCES ARE MARKED WITH THE SYMBOL
7.1

Lifting instructions

Mounting a large (Ø 440 mm) bobbin changes the center of gravity, and tipping and
crushing hazards exist when lifting. Protect yourself and warn bystanders of the
risk!
To avoid personal injury and / or equipment damage, lift using method and
attachment points shown here.
Ordering number for the lifting eye can be found on page 64.
bm55d1a
- 12 -
© ESAB AB 2013

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Warrior feed 304w

Tabla de contenido