Jacuzzi ALLUSION 6636 Manual De Instalación Y Operación página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Electrical Connections
DRAIN/OVERFLOW
For the air bath, a drain/overflow kit is included. This drain/
overflow kit must be used as it includes an electrically con-
trolled valve that allows the bath's air channels to drain when
the bath drain is opened. Refer to Drain Piping Assembly
Installation drawing.
Turn the bath upside down. Glue the 90° ell to the tee in
such a manner that it is sloping upward (with bath turned
upside down) to facilitate drainage making sure that any part
of the air channel drain piping assembly does not go above the
feet. Install drain overflow kit (provided). Connect the tubing
from the solenoid valve to the barbed fitting on the tail pipe and
secure with provided hose clamp.
Route the cables from solenoid valve and drain switch to
the control box and connect.
Note: When the bath is turned right side up it must be
propped up due to the length of the tail pipe.
DRAIN PIPING ASSEMBLY INSTALLATION
TAIL PIPE
BARBED FITTING
SOLENOID
VALVE
TO CONTROL BOX
Jacuzzi Whirlpool Bath© BR28000A 3/05
RELOCATING THE BLOWER MOTOR
fused control box can be installed in a remote location. The
blower motor and fused control box must be relocated as a
unit.
Fault Circuit Interrupter (GFCI), is required in the remote loca-
tion. Electrical connections should be performed by a licensed
electrician. The remote location must be service accessible.
15' of piping and 6 directional changes. Pipe diameter must
be 1-1/2" or larger. Choose a space as close to the bath as
possible so the system works as efficiently as possible. This
space must be at least 30 cubic feet and the blower must be
mounted at least 2" above the floor and 2" minimum away
from any wall. The blower must not be installed in an attic area.
shown in the illustrations. Do not glue piping to the blower.
Blower is attached to the piping via a screw. Glue the air pipe
and let set overnight before attaching the blower with screw.
duce system efficiency.
CAUTION: It is imperative to let the glued blower air pipe set
overnight as there may be fumes from the glue that could be
TEE
ignited if not allowed to dissipate.
90° ELL
cooling the motor and to supply sufficient air for the blower.
The intake of the blower must not be blocked, restricted or
have any debris around it that can potentially be sucked
into blower.
NOTE: Relocated blower requires a service access for the
control box and blower.
REMOTE LOCATION IN AN ADJACENT SPACE
REMOTE LOCATION UNDER FLOOR
6
For convenience and/or accessibility, the blower motor and
A separate circuit, which must be protected by a Ground
The total length of the air pipe must not require more than
NOTE: Do not remove the inverted U and check valve as
NOTE: Installing the Blower in a remote location will re-
Provide adequate ventilation in the remote location for
Insulation on the air pipe length can reduce heat loss.
CONTROL CABLE
ADJACENT
SPACE
DO NOT REMOVE
CONNECT ONLY
INVERTED U
TO A GFCI
PROTECTED
CIRCUIT
SCREW
DO NOT REMOVE
INVERTED U
CHECK
VALVE
CONTROL
LINE
FLOOR
FLOW
SCREW
CONNECT ONLY TO A GFCI
PROTECTED CIRCUIT
TO BLOWER
FLOW
CHECK VALVE

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Allusion 7236Allusion 7242

Tabla de contenido