Manufacturer's Plate; Fittings; Assembly Instructions / Inflation - Sevylor WATERTON Manual De Utilización

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23

MANUFACTURER'S PLATE

Part of the information is marked on the manufacturer's plate affixed on the kayak. The symbols used have the following
meaning:
Kayak
Maximum number of people on
board
Read the manufacturer's manual
before use

FITTINGS

Illustration model: WATERTON
Side chamber with
Boston valve
Transport
handle
Side chamber with
Boston valve
1/ Removable directional fin under the kayak – refer to the assembly instructions.
All models are supplied with a pressure gauge, repair kit, and transporting bag.

ASSEMBLY INSTRUCTIONS / INFLATION

 Do not use a sharp tool !
 Any use of an air compressor will damage your product and automatically void all warranties.
 Do not open the zippered closing that provides access to the inflatable inner chambers when the kayak is
inflated.
For the first inflation and in order to get acquainted with your new product, inflate indoors at room temperature where the
PVC will be soft and assembly process made easier.
If it was stored at a temperature below 0°C / 32°F, leave it at 20°C / 68°F for 12 hours before unfolding. Inflate it with a
®
Sevylor
inflator or any inflator designed for kayaks, pool floats, air beds, camping mattresses, and other low pressure
inflatables. These types of inflators will have a hose and adapters to fit the valves on this product.
Choose a smooth and clean surface to unfold your kayak.
1. Fix the directional fin to the bottom, folding the outer hull. Insert the ends of the fin into each of the holders provided
and tauten the outer hull as much as possible to secure it. This operation is not possible when the kayak has been
inflated. The curve of the fin must be towards the stern of the kayak.
2. Your kayak is equipped with :
a) Boston valve(s) and mini Boston valve (please see opposite figure) for inflating
bottom and side chambers. Unscrew the valve cap (1). Screw the valve insert (2)
onto its base (3) and check that the valve cap stays accessible. Insert the pump
hose end piece and inflate it until you will reach the required pressure (see point 3).
After inflation fit all the valve(s) cap tight (clockwise).
N.B.: A slight air-leak before screwing the valve(s) cap is normal. Only the valve(s)
cap can ensure final AIR TIGHTNESS.
b) Mini double-lock valve(s) for inflating seats. See drawing on page 2: Open the valve (A). To begin inflation, open
external stopper and pull to extend out (B). Insert nozzle of inflation device into the extended valve and turn on or
TM
Removable
1
directional fin
2
1
3
2
Bottom chamber with mini
Boston valve
Adjustable bucket seats with
mini double lock valves
WARNING!
4
Maximum transportable
load capacity
Recommended service
pressure
Do not use a compressor
Zip fastener for opening the
nylon outer hull and
accessing the PVC inner
chamber (bow and stern)
3
(1) Valve cap
Transport
handle
E
Figure 1
N
G
L
I
S
H
(2) Valve
insert
(3) Valve
base

Publicidad

Tabla de contenido
loading

Tabla de contenido