Ceiling Hanger Installation; Instalación De Los Soportes A Techo - HYTROL SB Manual De Instalación Y Mantenimiento

Ocultar thumbs Ver también para SB:
Tabla de contenido

Publicidad

l
Ceiling Hanger
Installation
If conveyors are to be used in an overhead application,
ceiling hangers may have been supplied in place of floor
supports.
Figure 7A shows how a ceiling hanger mounts to a con-
veyor section. Ceiling hangers should be mounted at
section joints. For safety information concerning con-
veyors mounted overhead, refer to
Precautions"
on Page 5.
NOTE: When installing ceiling hanger rods in an existing
building, all methods of attachment must comply with local
building codes.
FIGURE 7A
"Installation Safety
MOUNTING BOLTS
(TORNILLOS DE MONTAJE)
SIDE CHANNEL
(CANAL LATERAL)
PIPE RETAINER
(ABRAZADERA)
LOCK BOLT
(TORNILLO CANDADO)
l
Instalación de los
Soportes a Techo
Si los transportadores van a ser usados en aplicaciones
aéreas o superiores, soportes de techo pueden haber sido
suministrados en lugar de los soportes a piso.
La figura 7A muestra como un soporte a techo se instala
en un transportador. Los soportes deben montarse en la
unión de las secciones. Para información de seguridad
respecto al montaje de transportadores aéreos, refiérase a
"Medidas de Seguridad al Instalar"
NOTA: Cuando se instalan varillas colgantes en una con-
strucción existente, todos los métodos de unión deben
cumplir con los códigos locales de construcción.
CEILING HANGER ROD
(VARILLA COLGADA
AL TECHO)
SPACER
(ESPACIADOR)
JAM NUT
(CONTRA TUERCA)
SUPPORT PIPE
(TUBO DE SOPORTE)
JAM NUT
(CONTRA TUERCA)
en la página 5.
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sbi

Tabla de contenido